What are the preparations for power cables before laying?

What are the preparations for power cables before laying?

2022-05-07

What are the preparations for power cables before laying?

1. On-site inspection; According to the requirements of the engineering design drawings for on-site investigation, to understand the project content, the exploration of the power cable through the terrain and obstacles, for the planning of the road has not yet formed should consider the future urban planning encountered things, according to the voltage cross-sectional area and cable length and laying way to determine the cable release.

2. Develop a construction plan; formulate construction plans and technical and safety measures according to the results of on-site investigations. Determine the position of the connector according to the length of the power cable, reasonably arrange the cable release sequence, avoid and solve construction obstacles, etc.

3. Prepare tools and materials; understand material supply issues, and prepare mechanical appliances.

4. Check; Check the tools, verify whether the power model, specification and length meet the requirements of the drawings, check whether the power cable is qualified, etc.

 