loading
AAA  >  AI - Page Sitemap  >  AAA electric power cable craftmanship
AAA electric power cable craftmanship

AAA electric power cable craftmanship

Model:
BP-EFP 1×240mm²
Structure:
Cu / EPR / CTS/ Rubber Sheath
Conductor:
Tinned Copper
Insulation:
EPR
Sheath:
Rubber
Rated Voltage:
8.7/15kV
Cross-section:
1×240mm²
Standard:
Q/GL20-2017
Approvals:
CE
Packaging:
Wooden steel drum
MOQ:
1X20GP
Port of Loading:
Foshan, China
Lead Time:
20-40 days
Payment Terms:
T/T, 30% deposit before production, the balance before container loading.
Tape:
PPR
Price
Get Latest Price
Get the latest price
Quantity Needed:
Pieces
E-mail:


The design of AAA electric power cable is completed by our thoughtful designers who keep the health&safety standards and environmental protection concepts in mind. It is perfect to package birthday or wedding gift with this product
The production of AAA electric power cable is permitted by the industrial production license issued by the Country. And the quality of the product meets the mechanical seal standards of Administration of Quality Supervision, Inspection and Quarantine. This eye-catching product will contribute to marketing and enhancing brand names
The primary operations of AAA electric power cable cover several parts. The comminution and concentration are the most preliminary and essential parts and some modern mineral processing step such as sampling analysis may be conducted. The surface can be processed by 3D, hot stamping, gold stamping, embossing technology, etc
AAA epr power cable is required to go through microbiological testing before its shipping. Any signs of contamination in the product will be taken seriously and handled. The product is thick and solid enough to withstand puncture
AAA electric power cable is tested under an environmental test chamber. It is carried out by our engineers and technicians who spend time conducting fatigue testing of fans and performance qualifications of pumps.
The company strictly controls product quality and production costs, strives to reduce procurement costs in production, strengthens material management, reduces material consumption, establishes a complete quality management system in terms of product quality, and adopts strict quality inspection measures to ensure that [ 10368] are high-quality products with high cost performance.
Product Message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...